
Log Package
Log package delivery.

Foundation
Wood foundation and first floor deck.

Log Stacking
First log course.

Log Stacking
Third log course with window and door rough openings cut.

Log Stacking
Raised log walls.

Second Floor
Rough framing begins for the second floor loft, shed dormer and rafters.

Front Porch
Front porch and remain rough framing almost complete.

Roof
Roof complete.

Siding
Second story siding under construction.

Log Siding
Log siding and soffit trim installed.

Exterior
Exterior log finish completed.

Exterior
With the exterior finish completed, work begins on the interior T&G pine for all walls.

Bedroom
Putting the finishing touches on the bedroom.

Kitchen and Dining Area
Rustic wood cabinets and log furniture add to the ambience.

Tongue and Groove
Beautiful wood tongue and groove ceilings add warm and beauty to the interior.














