Moose Pond Cabin Log package delivery. ![]() Wood foundation and first floor deck.
First log course.
Third log course with window and door rough openings cut.
Raised log walls.
Rough framing begins for the second floor loft, shed dormer and rafters.
Front porch and remain rough framing almost complete.
Roof complete.
Second story siding under construction.
Log siding and soffit trim installed.
Exterior log finish completed.
With the exterior finish completed, work begins on the interior T&G pine for all walls.