Photo Gallery

driveway

Clearing the 1/4 mile driveway.

building site

The building site is high on top of the hill with views of Lake Leelanau.

driveway

Excavation and building the long and steep driveway.

driveway

A very, very steep driveway!

excavating foundation

Excavation for the foundation.

boomed pump truck

A boomed pump truck is used to pour the concrete footings and foundation.

foundation

Building the first floor deck on the foundation.

Lincoln Logs package

The Lincoln Logs package arrives! One of three tractor trailers.

D-logs

Unloading a bundle of D-logs.

log stacking seminar

Log Stacking Seminar.

log courses

Three log courses installed with nine more to go!

log stacking

Making good progress.

header log courses

Beginning header log courses over windows and doors.

front view

Front view.

side view

Side view.

14 log courses; 9 foot ceilings

Fourteen log courses completed for 9-foot ceilings.

14 log courses; 9 foot ceilings

First floor interior framing begins.

14 log courses; 9 foot ceilings

Second floor joist system.

14 log courses; 9 foot ceilings

Second floor framing begins.

14 log courses; 9 foot ceilings

Rafters are nailed to the beam over the office.

14 log courses; 9 foot ceilings

Setting the 27-foot laminated beam in the great room.

14 log courses; 9 foot ceilings

Our company Sky Trak lifting materials to the second floor.

14 log courses; 9 foot ceilings

All ridge beams have been set and work continues on building the rafter system.

14 log courses; 9 foot ceilings

2 x 12 rafters completed.

14 log courses; 9 foot ceilings

Installing sheathing on the second level.

14 log courses; 9 foot ceilings

Overhangs and roof sheathing being constructed.

14 log courses; 9 foot ceilings

Roof sheathing completed.

14 log courses; 9 foot ceilings

Roof shingles installed.

14 log courses; 9 foot ceilings

Work begins on the cedar shake siding.

14 log courses; 9 foot ceilings

Log accents added in the two front gables.

14 log courses; 9 foot ceilings

Installation of the windows begins.  Starting to look like home.

14 log courses; 9 foot ceilings

Loft and second floor rough framing.

14 log courses; 9 foot ceilings

View from the loft into the great room.

14 log courses; 9 foot ceilings

Rear of the log home facing Lake Leelanau.

14 log courses; 9 foot ceilings

Water well drilling in progress. The building site is 120 feet above Lake Leelanau, which means a very deep well.

14 log courses; 9 foot ceilings

Cedar shakes installed.

14 log courses; 9 foot ceilings

Log stair package installed. Very cool.

14 log courses; 9 foot ceilings

Jim installing laminated pilaster in the Great Room to strengthen the gable wall.

14 log courses; 9 foot ceilings

Wood stove and black chimney pipe installed just in time. It's cold outside!

14 log courses; 9 foot ceilings

T&G pine package for the Great Room ceiling acclimating to its new environment.

14 log courses; 9 foot ceilings

Rear of the model home with cedar shake and log siding trim installed.

14 log courses; 9 foot ceilings

Rough framing the 3-car garage package.

14 log courses; 9 foot ceilings

Roof sheathing installed.

14 log courses; 9 foot ceilings

Side elevation with garage.

14 log courses; 9 foot ceilings

Shingles installed on the garage.

14 log courses; 9 foot ceilings

Rough plumbing and radiant heat tubing installed.

14 log courses; 9 foot ceilings

Rough electrical installed.

14 log courses; 9 foot ceilings

R-38 fiberglass insulation being installed in the Great Room.

14 log courses; 9 foot ceilings

Insulation finished in the Great Room Ceiling.

14 log courses; 9 foot ceilings

Water heater, boiler and a lot of radiant tubing.